Fitness First France is using the Merus Technology In Bordeaux

2020-05-20T14:08:59+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

After installation of Merus devices in 193 Fitness First clubs in the United Kingdom, 25 Fitness First Clubs in the Netherlands, the management of Fitness First in France has decided to equip the 2 Fitness First clubs in Bordeaux with Merus devices. The management and

Top Trock Drying System for Schooner Eendracht

2020-05-20T14:09:14+02:00June 1st, 2013|Categories: All, Drying Systems|Tags: , , |

The crew and the trainees can profit from the Drying Systems for their sailing and working clothes on board of the Schooner Eendracht. This drying system is installed in the lockers on board and will support the crew and the Trainees with comfortable warm &

Fugro is using Merus rings on the Drilling Vessel MV Bucentaur

2020-05-20T14:09:53+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The company Fugro Netherlands has given the order to install the following Merus rings on the Geotechnical Drilling Vessel MV Bucentaur One 1 1/2" High Industrial Capacity Bio Ring at the Hydro for and a 2" High Industrial Capacity Bio Ring for the sanitary system

Boskalis is using Merus Technology for Hopper Dredger Oranje

2020-05-20T14:11:31+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The company Boskalis in the Netherlands has given the order to install the following Merus rings on the Hopper dredger Oranje For the Evaporator a 4" and a 1 1/2" High Industrial Capacity Ring and at the Calorifier a 2" and a 1 ½" High

Fitness First working with Merus Technology

2020-05-20T14:11:44+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , , |

After installation of Merus devices in 193 Fitness First clubs in the United Kingdom the management of Fitness First in the Netherlands decided to equip their 25 Fitness First clubs with Merus devices. This decision was made after a test period of 3 months at

Hotel Ara – van der Valk Group is using the Merus Technology

2020-05-20T14:12:08+02:00June 1st, 2013|Categories: All, Merus|Tags: , , , |

The management of Hotel Ara (van der Valk Group) decided to equip their hotel with Merus devices. This decision was made after a test period of 3 ½ months in their Hotel. The Merus devices were installed in the second part of 2008. The management

Title

Go to Top