Loading...
News2020-10-05T09:47:19+02:00

Fitness First Paris is also using the Merus Technology

The management from Fitness First France has decided to equip also Sainte Geneviève des Bois in Paris, after the installation of the two Fitness First Clubs in Bordeaux. The management and the clients from Fitness First will benefit from the advantages of less lime scale build-up and the comfortable sensation

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Drying system for Rescue Suits on the Vroon Standby vessels

The crew from the Vroon Standby Vessels can profit from the Drying Systems for their FRC suits, shoes, boots, gloves and working clothes on board of the following new vessels: • VOS Trader • VOS Tracker • VOS Trapper • VOS Traveller This drying system is installed in the FRC

Arklow in the Netherlands is using the Merus Technology

The company Arklow Shipping Netherlands has given order to install the following Merus rings on the Arklow Rally: One 2?Industrial Bio ring at the bunker feeding pipe One 1 ¼? Industrial Bio ring at the Hydro for One 1? Industrial ring for the Separator One 1 ½? Industrial Bio ring

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Fitness First France is using the Merus Technology In Bordeaux

After installation of Merus devices in 193 Fitness First clubs in the United Kingdom, 25 Fitness First Clubs in the Netherlands, the management of Fitness First in France has decided to equip the 2 Fitness First clubs in Bordeaux with Merus devices. The management and the clients from Fitness First

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Top Trock Drying System for Schooner Eendracht

The crew and the trainees can profit from the Drying Systems for their sailing and working clothes on board of the Schooner Eendracht. This drying system is installed in the lockers on board and will support the crew and the Trainees with comfortable warm & dry clothes.

June 1st, 2013|Categories: All, Drying Systems|Tags: , , |

Fugro is using Merus rings on the Drilling Vessel MV Bucentaur

The company Fugro Netherlands has given the order to install the following Merus rings on the Geotechnical Drilling Vessel MV Bucentaur One 1 1/2" High Industrial Capacity Bio Ring at the Hydro for and a 2" High Industrial Capacity Bio Ring for the sanitary system (waste pipe to the Vacuum

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Boskalis is using Merus Technology for Hopper Dredger Oranje

The company Boskalis in the Netherlands has given the order to install the following Merus rings on the Hopper dredger Oranje For the Evaporator a 4" and a 1 1/2" High Industrial Capacity Ring and at the Calorifier a 2" and a 1 ½" High Industrial Capacity Bio Ring With

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Fitness First working with Merus Technology

After installation of Merus devices in 193 Fitness First clubs in the United Kingdom the management of Fitness First in the Netherlands decided to equip their 25 Fitness First clubs with Merus devices. This decision was made after a test period of 3 months at two of their clubs. The

June 1st, 2013|Categories: All, Merus|Tags: , , , , |

Hotel Ara – van der Valk Group is using the Merus Technology

The management of Hotel Ara (van der Valk Group) decided to equip their hotel with Merus devices. This decision was made after a test period of 3 ½ months in their Hotel. The Merus devices were installed in the second part of 2008. The management and the clients from Hotel

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Health City working with Merus Technology

The management of Health City decided to equip their first clubs with Merus devices. This decision was made after a test period of 2 ½ months in two of their clubs. The Merus devices were installed in the second part of 2008. The management and the clients from Health City

June 1st, 2013|Categories: All, Merus|Tags: , , , |

Title

Go to Top